LITHIC

LITHIC Core · Construction intelligence

Buildings shouldn’t lose their memory.

Connect what you design with what you choose—and why.

Bring model evidence, construction Recipes and material decisions together. Explore generic cost and embodied carbon before choosing manufacturer Products, with a traceable record as decisions develop.

Applications are open for a guided beta. We’ll agree a supported project scope with each pilot team.

Read The Building Remembers
01 · Construction RecipeFrom the build-up to its requirements

Structure, insulation, finishes and openings—each with its own evidence.

02 · Product choicesRefine the specification

Review suitable manufacturer options against the material requirements.

Illustrative building and material choices. Pilot capabilities and evidence coverage are agreed during onboarding.

A connected decision process

The model is the starting point.
The reasoning should stay with it.

Project knowledge becomes difficult to reuse when quantities, specifications and assumptions live in separate places. Bring those decisions back to their model context as your specification develops.

Model evidence

Know what the numbers refer to.

Keep project, model version, element and quantity evidence in view. Unsupported or incomplete information remains unresolved.

Progressive assessments

Start generic. Refine deliberately.

Develop cost and carbon independently as suitable evidence becomes available. Distinguish partial subtotals from complete results.

Decision history

Keep the basis for comparison.

Retain a generic baseline and the assumptions behind it as the specification develops towards Product choices.

A progressive decision workflow

From model evidence
to material decisions.

01

Connect your model

Start with model evidence from Autodesk ACC / Forma or supported Archicad exports.

02

Confirm the construction

Classify elements and confirm Recipes, material requirements and model-derived quantities.

03

Assess before choosing Products

Use qualified generic rates and factors to assess cost and embodied carbon. Keep missing evidence visible.

04

Refine with Products

Develop manufacturer-specific choices against the generic baseline, retaining the evidence behind each assessment.

The beta is being verified across supported ACC / Forma and Archicad workflows. Source coverage, quantity rules and available cost/carbon evidence determine what can be assessed. Applying for a pilot does not create an account or grant immediate access.

Foundational by nature. Trusted by design.

AI interprets.
Engine decides.

Ask LITHIC helps interpret evidence and propose next steps. Approved inputs and explicit rules govern calculations and recorded decisions.

What a traceable assessment needs

  • Model scope and requirement quantities
  • Material and evidence versions
  • Cost inclusions and exclusions
  • Carbon lifecycle modules and assumptions
  • Visible gaps and a reproducible record

Same evidence, assumptions and dataset versions should reproduce the same result.

Build the beta with us

For teams making
construction choices.

We’re looking for architects, BIM specialists, cost and sustainability teams who want to test a clearer path from model information to material decisions on a defined project scope.

Early access · Guided beta

Help shape the next
construction decision.

Apply to explore LITHIC Core with your team, or join the waitlist for a follow-up about availability.

Tell us what you work on and what you need to assess. We’ll discuss fit, supported integrations and pilot scope before access is arranged.

Prefer a conversation? Book a demo ↗

Already applied? See what happens next ↗

How would you like to get involved?

No account or payment required. Please don’t include confidential project data.